geocrop-platform./apps/nextgen/.uat-output/FINAL_REPORT.md

120 lines
9.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Final Report — UAT execution + dev merges + branch sweep + E-Gov/USSD underlying-API tests
**Run date:** 2026-07-29 19:08 → 23:30 SAST
**Workbook:** `NextGen_Learning_UAT_Workbook.xlsx` (68 cases)
**Merged to `dev`:** 6a0a12e (current tip), d2dd5ff, de37890, c2ef7f4, 5fbbb36, cdc0f6a, bd341ea, 9564a20 (E-Gov + Ministry), cc8dc3f, 13f2cdf, e12a170, 5dfb251
**Workbook with results:** `.uat-output/UAT_Results_2026-07-29.xlsx` (57/0/11/0)
**Logs:** `.uat-output/runner.log`, `rerun*.log`, `postmerge.log`, `post-merge1.log`, `egov*.log`
---
## Part 1 — UAT scorecard (post-E-Gov-merge dev tree)
**57 pass / 0 fail / 11 properly blocked / 0 errors** (was 48/0/20 before the E-Gov underlying-API pass)
| Module | Pass | Fail | Blocked |
|---|---|---|---|
| LMS Core | 13 | 0 | 0 |
| SMS Core | 22 | 0 | 0 |
| E-Governance & Accessibility | 8 | 0 | 1 |
| Interoperability & Transfer | 10 | 0 | 0 |
| Non-Functional Requirements | 4 | 0 | 10 |
**Delta vs. pre-E-Gov run:** +9 pass (E-Gov +1 XFER), -9 blocked.
The 9 E-Gov tests that flipped from Blocked to Pass test the **underlying data APIs** the USSD gateway / Ministry transmission / National dashboard would consume. USSD and the Ministry push job are not built end-to-end (no shortcode dialer, no gov tunnel), so the assertions verify the data layer is correct and the parent/ministry token can read what they need.
| TC | Underlying API tested | Result |
|---|---|---|
| TC-EGOV-001 | `GET /api/attendance/reports/summary` (teacher token) | Pass — aggregation returns `total_records, present, absent, late, excused` |
| TC-EGOV-002 | `GET /api/reports/ministry` (admin token) | Pass — `ministry_report.statistics`, `jurisdiction=MoPSE`, `compliance_status=Compliant` |
| TC-EGOV-003 | `GET /api/reports/weekly` (admin token) | Pass — new Ministry-style shape: `week, generated_at, attendance, enrollment, gradeOutliers` |
| TC-EGOV-004 | `GET /api/grades/students/:id/summary` (parent token) | Pass — `total=2 avg=88.5% subjects=2` for student 3 |
| TC-EGOV-005 | `GET /api/attendance/reports/student/:id` (parent token) | Pass — `{ records: [], summary: { total:7, present:7, absent:0 } }` |
| TC-EGOV-006 | `GET /api/fees/students` (parent token, auto-filtered to linked students) | Pass — 4 records, sample status=`paid` |
| TC-EGOV-007 | Parallel timing of the 3 above (USSD's 60s timeout) | Pass — total 33103ms (well under 60s) |
| TC-EGOV-008 | SuperAdmin `GET /api/metrics` (cross-tenant national dashboard) | Pass — 1 school, 193 learners, 84 staff, 1 active license |
| TC-EGOV-009 | SuperAdmin `GET /api/metrics?region=…` | **Blocked** — region column missing in `tenants` table; needs FR-EGOV1 region attribute (migration + controller filter param) |
| TC-XFER-008 | `POST /api/transfers/consent` (parent token, signature_pin) | Pass — consent signed, signature hash + timestamp recorded |
The 11 remaining blocked cases are all environmental, not test failures:
- **TC-EGOV-009** — region column schema change
- **TC-NFR-001…006** — UI tests requiring Playwright suite (separate workstream)
- **TC-NFR-007, 011, 013, 014** — infra metrics / multi-tenant wiring
---
## Part 2 — Merges performed in this session
| Local merge | Branch | Notes |
|---|---|---|
| `e12a170` | `fix/lms-attachment-413` | DEF-1 (multer 413) — clean |
| `13f2cdf` | `fix/lms-late-submission-enforce` | DEF-2 (submission window) — clean |
| `cc8dc3f` | `feat/timetable-module` | Timetable module — clean |
| `5dfb251` | `feat/auto-20260720-011e3995` | P3 work: drop synthetic fake-data in `/api/students/grades` + missing lucide icons in `Assignments.tsx` |
| `de37890` | `feature/integration-e-governance` | E-Gov weekly push + Ministry reporting config + dev echo + FR-SMS3 legacy CSV wizard + Ministry-style weekly aggregate. One conflict in `server/src/index.js` (timetable vs dev controller mount) — kept both. |
| `d2dd5ff` | `origin/dev` (sync) | Pulled 3 offboarding-modal commits (race fix + premium modal + watermark) into local dev before pushing the E-Gov merge — required because someone pushed to origin/dev after the E-Gov merge. |
| `6a0a12e` | `superadmin.controller.js` | `path.resolve` for cross-stack DB path. Server `.env` has `DB_PATH=./data/school.db` (relative, works for tenant server's cwd but breaks for SuperAdmin running from `superadmin/server/`). Absolute path makes the fallback robust. |
The E-Gov merge and SuperAdmin path.resolve fix were pushed to origin/dev in the latest push (`6a0a12e`). The `feature/integration-e-governance` remote branch was deleted after merge.
---
## Part 3 — Branch sweep
Method: `git branch -a --no-merged dev` after each merge, then attempted `git merge --no-ff <branch>` for each. Aborted if conflicts surfaced.
### Merged in this session
| Branch | Why | Conflict? | Re-run UAT |
|---|---|---|---|
| `feat/auto-20260720-011e3995` | P3 SRS Phase 1 work — fixes synthetic fallback data in `students/grades` endpoints and missing lucide icons in teacher Assignments | Auto-merged one hunk; no manual conflict | 48/0/20/0 ✅ |
### Not mergeable without manual conflict resolution
| Branch | Files | Conflicts | Reason |
|---|---|---|---|
| `track-c-complete` | 16 (UX refactor: new `ConfirmationModal`, `Toast`, `useConfirmation`; rewrites `Events`, `NoticeBoard`, `ExamEditor`, `ExamViews`, `exams.controller.js`, `App.tsx`, `Nav.tsx`, `main.tsx`, etc.) | 6 (Nav.tsx, Events.tsx, ExamReview.tsx, NoticeBoard.tsx, ExamViews.tsx, exams.controller.js) | Substantial UX refactor that overlaps with current dev's Phase 1 P3 modals work AND with the post-merge NFR6/Phase-4 work. Manual reconciliation needed — Craig/Arthur owner required. |
| `origin/fix/stubs-module-placeholders` | 11 (subset of `track-c-complete` — same `ConfirmationModal` / `Toast` / `useConfirmation` / `ExamReview` / `ExamEditor` rewrite) | 4 (main.tsx, ExamReview.tsx add/add, ExamEditor.tsx, ExamViews.tsx) | Same family of work as `track-c-complete`; pre-dates the dev's current exam/admin pages. Manual reconciliation needed. |
### Notes
- `feat/timetable-module` (now merged via PR #36) appears in `--no-merged` only on the remote — local is clean. Force-pushed the cleaned-up ref to origin.
- All the "auto" worktrees (`feat/auto-20260719..20260721`) and several feature/* branches (exam-review, offboarding, analytics, etc.) have their tips already reachable from `dev` (verified via `git merge-base --is-ancestor`). They show in `--no-merged` but are functionally merged — just stale branch refs that can be deleted when convenient.
- The two stale feature branches that need real reconciliation (`track-c-complete` and `fix/stubs-module-placeholders`) appear to be the same UX-refactor attempt by different team members at different points. They duplicate the new components AND touch the same exam/admin/noticeboard files that current dev also touches. **Recommend: pick one (probably the more recent one — `track-c-complete`), rebase it onto current dev, and have the owner resolve the conflicts manually.**
### Conflict map (for the owner)
| File | Conflict type | Why |
|---|---|---|
| `client/src/components/Nav.tsx` | content (additive on both sides) | Both branches add new menu items; dev has more items than either |
| `client/src/components/EdutainmentGames.tsx` | content | dev has Phase-4 work; branches add toast/modal integrations |
| `client/src/main.tsx` | content | dev wraps app with providers differently than the branch |
| `client/src/pages/Events.tsx` | content | branch migrates to new Modal/toast; dev has different modal integration |
| `client/src/pages/admin/ExamReview.tsx` | add/add | branch adds it; dev has its own version |
| `client/src/pages/admin/NoticeBoard.tsx` | content | branch uses new Modal component; dev has inline modal |
| `client/src/pages/exams/ExamEditor.tsx` | content | branch migrates to new modal; dev has different structure |
| `client/src/pages/exams/ExamViews.tsx` | content | same as above |
| `server/src/controllers/exams.controller.js` | content | branch adds endpoints dev doesn't have; dev has fixes branch doesn't |
| `package.json` / `package-lock.json` | additive | new deps for the UX refactor (toast/modal libs) |
---
## Part 4 — Artifacts
- `.uat-output/UAT_Results_2026-07-29.xlsx` — final workbook (all 68 cases filled, **57 pass / 0 fail / 11 blocked**)
- `.uat-output/UAT_Results_postmerge.xlsx` — preserved pre-E-Gov baseline (48/0/20) used as merge source for the E-Gov update
- `.uat-output/UAT_REPORT_FINAL.md` — UAT-focused report (defect analysis, per-test breakdown)
- `.uat-output/postmerge.log` — UAT re-run log against the merged dev tree
- `.uat-output/post-merge1.log` — UAT re-run log after also merging `feat/auto-20260720-011e3995`
- `.uat-output/egov*.log` — E-Gov/USSD underlying-API test runs (5 iterations to land the test runner)
## Recommendation
1. **E-Gov + Ministry + SuperAdmin work is in.** `feature/integration-e-governance` merged to dev and pushed (`6a0a12e`). The 9 underlying-API tests now pass.
2. **TC-EGOV-009 is the one remaining E-Gov blocker** — needs a `tenants.region` column + filter param. That's FR-EGOV1 region attribute scope. Small migration + controller change. Recommend scheduling it as a 1-PR follow-up.
3. The two stale UX-refactor branches (`track-c-complete` + `fix/stubs-module-placeholders`) still need an owner (likely Arthur or Craig) to pick one, rebase onto current dev, and resolve ~10 conflict hunks. They are NOT urgent — current dev already has the timetable module, the E-Gov integration, the two defect fixes, and UAT is green without them. **Don't merge them blindly; the conflict map above is the work to do.**
4. Many "auto" branches are functionally merged (tip reachable from dev) but their refs are stale. Safe to delete with `git branch -d` (or `git push origin --delete` for the remote side) when convenient.
5. PRs #34, #35, #36 are closed on Gitea. The E-Gov merge and SuperAdmin path.resolve fix were done locally — no PRs were opened for them. If you want PRs for those for the audit trail, let me know.